Al Bateen Airport Gate and Infrastructure

The Contract covers Design only of an Entrance gate which interprets a modern aerodynamic design. The maximum height of gate is 19 m and Design and Construction of a Boundary wall extending for  1.35 Kms. The Infrastructure consists of interlocked paving,  dual carriage way , upgrading potable water network,  laying new utility system for storm water, firefighting , irrigation and street lights and Construction of underground RCC water tanks